Reports Hub Page
What This Page Does
Shows the main reports hub, scoped analytics cards, recent export audit history, scheduled reports, disaster after-action reporting for eligible Programs, and the Google Data Studio connector setup for organization reporting datasets and leadership report templates.
How To Use This Page
- Open Reports Hub.
- Review the available report, analytics, export, schedule, or connector workflow.
- Confirm the active organization or program scope before interpreting metrics, downloading exports, or issuing connector access.
- Use Preview on a prebuilt report before downloading; if report-specific data is not available for the selected Program, review the inline preview status instead of assuming the click failed.
- Use Open AidOrbit Connector to launch the maintained Google Data Studio connector URL, then create a reporting-only key when Google Data Studio prompts for AidOrbit access.
- Use Google Data Studio connector only when an Organization Leader needs a reporting-only key for the private AidOrbit connector; store the one-time key securely and rotate or revoke it when access changes.
- In Google Data Studio, choose a Program Leader, Organization Leader, or Organization Staff report template when one matches the question; otherwise create one data source per approved dataset and blend them with stable IDs such as program_id, location_id, mission_id, shift_id, volunteer_id, and signup_id when cross-dataset correlation is needed.
- For Disaster Response / Emergency Management Programs with after-action reporting enabled, use the incident summary or after-action report to review Program-scoped Mission, assignment, attendance, approved-hour, and incident counts without exposing sibling Program data.
- Download report CSVs only when your role includes export permission; view-only report access does not allow direct CSV downloads.
- Review Recent Exports when you need to verify the exact scope, filters, or audit timing behind a download.
- Use Escalate report when a metric, export, or report issue needs Program Leader or Organization Leader review.
- Open the relevant report workflow and confirm the result.
Page Link
/mission-control/reports